Sydney Water Big Lift Project
The Sydney Water big lift (#2 Digester Tank Upgrade) is an exciting project involving the removal of the existing Digester Tank roof to allow for the upgrade to take place. The project also includes stainless steel pipe work replacement (fabrication & installation).
The Digester roof removal required 450ton Mobile Crane to remove roof section, weighing approximately 70ton.
Working along side Downer Group and Eneraque, Allfab was responsible for ensuring the rigging configuration was correct for the lift, this enabled the roof to be lifted in a level position.